ZAL DRAWINGS
GENERAL INFORMATION
General information document
LINKS OF INTEREST
Mediterranean Corridor
- Mediterranean Core Network Corridor
- State Mediterranean Corridor
- Presentation of the Mediterranean Corridor
Logistics Strategy of Spain
Study for the development of railway highways
Strategic Plan to Promote Rail Freight in Spain
LINKS TO PUBLIC INFORMATION
http://sitmurcia.carm.es/web/sitmurcia/programa-actuacion-territorial-zal-murcia-medfood
TASK PERFORMED
- Assistance to prepare the proposal for requesting the European subsidy and developing the administrative management model during 2016 (EuroVértice)
- Assistance to draft the Territorial Action Program Advancement and Initiation Document of the Strategic Environmental Evaluation Procedure (Getnisa)
- Analysis of business model alternatives for development and operation of Murcia’s intermodal terminal and annex Logistics Zone (Teirlog Ingeniería)
- Design and layout of the project's website (Germinal Comunicación)
- Topographic survey and cartography necessary for the elaboration of studies and projects(Área Topografía y Sistemas)
- Preparation and monitoring of the contingency plan and the communication plan of the project (Eurovértice).
- Drafting of the Preliminary Draft of Basic Infrastructures for the Intermodal Terminal. (Trazado de Carreteras y Obras Hidráulicas).
- Drafting of the Drafting of the Territorial Action Program of the Intermodal Terminal and Logistics Activities Area of Murcia (ZAL of Murcia - MEDFOOD) and Document of Strategic Environmental Assessment (Pedro Antonio Botella Sánchez)
- Informative Study, Environmental Impact Study and Basic Project of the Railway Connection of the Intermodal Terminal (TI) and Logistics Activities Zone (ZAL) of Murcia (Investigación y Control de Calidad).
- Informative Study, Layout Project and Environmental Impact Study of the Road Connection of the Intermodal Terminal and ZAL of Murcia with the high-capacity road network: section connecting the A-7 motorway with the MU-30 and MU-31 motorways (Asistencia en Ingeniería y Obra)
- Basic and Functional Project of the Intermodal Terminal (TI) and Logistics Center of the Logistics Activities Zone (ZAL) of Murcia (Pròxima Ingenieros)
- Definition of the urban planning of the Logistics Activities Zone (ZAL) of Murcia (Getnisa)
- Drafting of Specific Technical and Administrative Specification Sheets for the contracting of the following projects: - Construction project for road access to the Intermodal Terminal and Logistics Activities Area of Murcia. - Construction project of the railway access to the Intermodal Terminal and Logistics Activities Area of Murcia. - Construction project of the Intermodal Terminal of the Logistics Activities Area of Murcia. - Construction project of the electrical connection of the Intermodal Terminal and Logistics Activities Area of Murcia. (Pronial)
- Support for project coordination (EuroVértice)
- Recruitment for developing of the road connection project (Joint Venture Naser-Innovo)
- Recruitment for developing of the railway connection project (Joint Venture Mk-Fhecor)
- Recruitment for developing of the electrical substation and high voltage line project (Typsa)